Step 1
Ensure that the first layer of Earthwool is the same thickness as the ceiling joists and roll out from the roof tiles to the centre of the loft. More
Step 2
When space along the joists is filled, the end of the roll be turned back to start an extra layer of insulation or may be cut to size.More
Step 3
Layer insulation to the required thickness
ensuring the ceiling beneath is completely
covered except directly under the water tank.More
Step 4
The Second Layer of Earthwool is laid at right angles
to the ceiling joists, with all the edges

butted togetherMore